Project: Turn-key ducting project

Project

Turn-key ducting project

A complete turn-key ducting installation was delivered, covering design, fabrication, and commissioning.

The scope includes complete engineering of steel structures, stair tower, platforms and ducting. The project ensured seamless integration within the existing plant layout.

Category

Specifications

Application Raw gas ducting
Dimensions Ø1.600 mm
Material 1.0038
Weight 40t
Design Temperature 120°C
Design Pressure -500 daPa
Start-up date 2021

Impressions

Other projects in the same industry

175.000 m³/hr

During the shutdown of only 20 days, the existing filter was dismantled and the new stainless steel filter was fully constructed & successfully commissioned. It […]

550.000 m³/hr

A high-capacity tertiary filter plant to prevent diffuse emissions of lead particles. The filter plant has a modular design, making it suitable for very high […]

35.000 m³/hr

An ATEX filter has been installed in an explosive environment. The filter installation is engineered for a maximum overpressure of 400 mbar and is equipped […]