Project: Primary gas cleaning system

Project

Primary gas cleaning system

During the shutdown of only 20 days, the existing filter was dismantled and the new stainless steel filter was fully constructed & successfully commissioned.

It concerns an advanced flue gas cleaning installation with continuous lime injection to minimize SO2-emissions. Since 2018, the installation has been in continuous operation, compliant with the strictest emission standards, still using the first set of filter bags. This concerns a turn key project with a focus on planning and project management.

Category

Specifications

Application Primary Gas Cleaning
Start-up date 2018
Type of Filter MSF 3-12-8/6-4x
Filter surface 3.345 m²
Gas flow 175.000 m³/hr
Design Temperature 250°C
Design Pressure -750 daPa

Impressions

Other projects in the same industry

550.000 m³/hr

A high-capacity tertiary filter plant to prevent diffuse emissions of lead particles. The filter plant has a modular design, making it suitable for very high […]

35.000 m³/hr

An ATEX filter has been installed in an explosive environment. The filter installation is engineered for a maximum overpressure of 400 mbar and is equipped […]

A water-cooled ducting system produced in AISI 316Ti to manage extreme gas temperatures is completely replaced during a 100hr shut down period.