Project: Furnace off-gas system
Project
Furnace off-gas system
During the winter shutdown period of only 14 days, a filter plant including the E-scope was fully replaced, commissioned and successfully put into operation.
The filter plant is connected to various primary and secondary processes which are balanced by means of a mixing chamber.
Specifications
Impressions
Other projects in the same industry
During the shutdown of only 20 days, the existing filter was dismantled and the new stainless steel filter was fully constructed & successfully commissioned. It […]
A high-capacity tertiary filter plant to prevent diffuse emissions of lead particles. The filter plant has a modular design, making it suitable for very high […]
An ATEX filter has been installed in an explosive environment. The filter installation is engineered for a maximum overpressure of 400 mbar and is equipped […]