Project: Paper reject incineration

Project

Paper reject incineration

In a total project time of just 19 days, an existing filter was completely demolished and the new filter system according BAT, was built and commissioned.

During the engineering phase, the existing situation was taken into account and adapted to the footprint of the new installation to ensure the requested lead time for project execution and regarding the Eurocode 3 (EN1993) design criteria.

Category

Specifications

Application Paper Reject Incineration
Start-up date 2022
Type of Filter MSF 4-14-8/2-4
Filter surface 2.160 m²
Gas flow 130.000 m³/hr
Design Temperature 240°C
Design Pressure -750 daPa

Impressions

Other projects in the same industry

Due to extreme wear of the filter base plates and cleaning system, despite the applied glass flake coating, there were continuous dust emissions and the […]

An electrostatic precipitator was upgraded to increase electrode spacing combined with installing 3-phase transformers and raise internal design temperatures to 450°C, by altering the material […]

Seven stainless steel chimneys including horizontal flue gas exhaust ducts in material grade 1.4571 were engineered for corrosion-resistant exhaust discharge. The design and choice of […]

Ready to elevate your project? Let's discuss your goals and create a custom solution

Our expertise isn’t just in filters, it’s in foresight. We understand what downtime means for your business. We move with purpose to restore flow.

Scroll naar boven