Project: ESP waste incineration
Project
ESP waste incineration
An electrostatic precipitator was upgraded to increase electrode spacing combined with installing 3-phase transformers and raise internal design temperatures to 450°C, by altering the material into 1.5415 (16MO3). The modernization improved collection efficiency and enhanced system robustness.
Specifications
Impressions
Other projects in the same industry
Due to extreme wear of the filter base plates and cleaning system, despite the applied glass flake coating, there were continuous dust emissions and the […]
Seven stainless steel chimneys including horizontal flue gas exhaust ducts in material grade 1.4571 were engineered for corrosion-resistant exhaust discharge. The design and choice of […]
For a client in the WTE sector with 7 incineration lines, each equipped with 2 ESP’s, we provide scheduled and ad-hoc maintenance on the ESP’s […]